Once the decision is bid, the estimate takes shape as scopes — each carrying its own pricing and budget — and the proposal generates from that same data instead of being re-typed into a document.
Chapter 3 of 8 · 0:26 · the full walkthrough unlocks with one form, once.
SubSmart captures scopes and budgets from whatever bidding system the numbers start in, and turns them into the estimate that will run the job. Labor, materials, and equipment are budgeted at bid time, so if the job is won, job costing starts with something real to measure against. Professional, branded documents generate straight from the data — no retyping, no version drift between the bid and the proposal the client sees.
Next, if we decide to bid, we take the requisite information from any bidding system, capturing scopes and budgets, and generating professional documents.