SubSmart
Product Tour Get a Demo
SubSmart Solutions

T&M tickets that get signed, approved, and paid — not lost in a truck

Every subcontractor knows the story: the GC asks for extra work, the crew does it, and the paper ticket dies in a binder. SubSmart makes the time-and-material ticket a first-class record — captured in the field, signed on the spot, and connected to the change order and the invoice it becomes.

Signed at the jobsite, not chased for weeks

Crews open a T&M ticket right from their daily report, describe the work, and hand the phone to the superintendent for a signature. The ticket moves through a real status pipeline — new, ready for signature, signed, reviewed — so nothing sits in limbo and nothing gets forgotten.

From signed ticket to change order — without retyping

A signed ticket isn't the finish line; getting paid is. In SubSmart, signed T&M tickets attach directly to a change order request, the change order carries its own approval pipeline, and once it's contracted, the amount lands on the billing request alongside your base scopes. One thread from field work to bank account, with the audit trail intact.

30 seconds: a signed ticket becoming a change order becoming a billing line.

A pipeline, not a pile

Because every ticket is a record with a status, the office sees the whole picture: which tickets are waiting on a signature, which are signed but not yet on a change order, and which are billed. That visibility is the difference between managing extra work and discovering it at closeout. And since it all lives on the same platform as billing and the rest of the job, nothing needs to be reconciled across systems.

Frequently asked questions

How do crews capture a T&M ticket in the field?

From their daily report on their phone: describe the extra work, note the dates, and hand the phone to the superintendent for an on-screen signature — at the jobsite, the day the work happens.

What happens after a ticket is signed?

The signed ticket attaches to a change order request. Once the change order is approved and contracted, the amount appears on the billing request alongside base scopes — no retyping.

Can the office see unsigned tickets?

Yes. Every ticket moves through a visible status pipeline — new, ready for signature, signed, reviewed — so stale tickets surface before they become disputes.

Does SubSmart replace paper triplicate T&M forms?

Yes. Tickets are digital records tied to the job and daily report, signatures are captured on-screen, and branded documents can be generated from the data when a GC wants paper. Watch the flow in the product tour.

Stop leaving extra work unbilled

Get a Demo →
More from SubSmart: Progress billing · Waterproofing subcontractors · Firestopping contractors · Full product tour